The scope of services of M&P
- Modernisation and expansion of building services for a listed theatre
- €154 million investment
- Building services planning and construction supervision (Work Groups 1–8)
- Tailor-made solutions balancing heritage conservation and modern theatre operations
- Fully three-dimensional (3D) planning
The city of Krefeld has decided to comprehensively renovate and extend the municipal theatre building, which was designed by the architect Graubner and constructed in 1951/1952. Also on stage: M&P. Our experts are modernising the building services within the outdated building structure – with ingenuity and a clear eye for what is technically feasible.
The Krefeld and Mönchengladbach Theatre is now Germany’s oldest merged theatre. With its four disciplines – musical theatre, drama, ballet/dance and orchestra – and around 500 staff, it brings an impressive variety of productions to the stage.
The building housing the Krefeld Municipal Theatre, however, is showing its age. Originally opened in 1952 as a temporary venue under the name ‘Kulturscheune’ and later converted into the Municipal Theatre, it is still in use today. Now the theatre is undergoing a comprehensive refurbishment.

Image: © Andreas Bischof
Planning at the intersection of heritage and modernity
Together with the lead design team, bbp Architekten, and the Paris-based architectural practice Fabre Speller, M&P Essen was awarded the contract for the design and construction supervision of the building services.
For M&P, this project represents an exceptional opportunity to play a part in shaping the future of this architecturally remarkable building – which has been a listed building since 2010 – and to take its building services to a new level.
A project team comprising architects, engineers, structural engineers, fire safety experts, building physics specialists, stage designers and landscape architects is currently working intensively to redesign existing spatial layouts, optimise the building services systems and translate the requirements of users and clients into bespoke solutions.
With the necessary tact and sensitivity, the aim is to reconcile the requirements of heritage conservation with those of a modern theatre operation – whilst keeping costs under control.

![]()
Services provided by M&P: Completely rethinking building services
Due to the advanced age of the building and the existing technical infrastructure, the City of Krefeld – with consultancy support from M&P – has decided to dismantle and replace all building services falling under HOAI system groups 1 to 8 (excluding stage technology). The total investment of around 154 million euros is a clear indication of the complexity and high demands of this construction project. One of the greatest challenges for our planning team is ensuring compliance with and implementing current standards and guidelines relating to the building structure and the heritage protection regulations in force since 2010. Whereas ventilation ducts used to fit easily into the airspace above the foyer ceiling – which is now a listed feature – technical expertise, creativity and a good dose of imagination are now required to find new solutions and meet significantly stricter requirements within a confined space.
To ensure early coordination and optimal alignment, a consistent three-dimensional planning approach is adopted for both the architectural design and the building services engineering.
![]()

Timetable and Outlook
A key milestone was the Krefeld City Council’s approval of the construction project in December 2024. Following approximately three years of construction and a three-and-a-half-year planning phase, the theatre company is set to return to the refurbished building in July 2030.
Martin Niewiera, Managing Director of M&P Essen GmbH, is already full of enthusiasm:
“It’s a pleasure to be involved in such an extraordinary project. Despite all the challenges that a listed building presents, everyone involved – from the client and users, through the project management team, to the architects and specialist engineers – is pulling in the same direction. Our shared goal is clear: the Krefeld City Theatre is to shine anew as the region’s jewel in the crown for decades to come.”